Demolition of Existing RCC Boundary Wall for 11KV SEWA Substation and Removal of Debris from the Site
This work involves the systematic demolition of the existing reinforced cement concrete (RCC) boundary wall located at the 11KV SEWA substation. The demolition will be carried out with utmost care, ensuring the safety of nearby infrastructure, equipment, and personnel.
The scope includes:
-
Careful dismantling of the RCC wall using appropriate mechanical or manual methods.
-
Segregation of reusable materials (if any) and disposal of unusable materials as per local regulations.
-
Loading, transportation, and complete removal of all demolition debris from the site to an approved disposal location.
-
Site clearance and leveling after removal, ensuring the area is left clean and safe for further construction or operational use.
All demolition work shall comply with relevant safety standards, environmental guidelines, and authority requirements to avoid disruption to the functioning of the substation.
Project Name :Demolition of Existing RCC Boundry Wall for 11KV Sewa Substaion and Removal of Debris From the Site
Location : Sharjah Power Distribution
Client : SEWA
P.O. : SPD/L/22/0081082