Construction Of New Transformer Foundation

Construction of New Transformer Foundation (485 × 485 cm)
This work involves the construction of a new reinforced concrete foundation for the installation of a power transformer. The foundation dimensions are 485 cm × 485 cm, designed to support the operational load and vibration of the transformer while ensuring long-term structural stability.
Scope of Work Includes:
-
Site preparation, including excavation and leveling as per approved drawings.
-
Installation of formwork and steel reinforcement as per structural design.
-
Casting of reinforced cement concrete using approved grade (e.g., M25 or as specified).
-
Provision of embedded items such as anchor bolts, earthing terminals, and cable trenches as per utility/company standards.
-
Curing of concrete for the required duration to ensure proper strength development.
-
Finishing, leveling, and slope provision for drainage (if applicable).
-
Quality control tests, including concrete slump, cube tests, and alignment checks.
All works shall be carried out in accordance with relevant civil and electrical standards, ensuring readiness for transformer installation.
Project Name :Construction of New Transformer Foundation (485 × 485 cm)
Location : Sharjah Power Distribution
Client : SEWA
P.O. : SPD/L/21/0078402